Location / Name:
Chesapeake Beach MD, Calvert County
What's Here:
the Chesapeake Railway Museum and, over in Annapolis:
the Maryland State Capitol
the Naval Academy
the Maryland Renaissance Faire
Northrop Grumman Bay Bridge Facility
the Bay Bridge
Data:
GPS Coordinates: as needed
Phone A/C: 410
ZIP: 20732
Access by train/transit:
None
Geography:
Kinda flat
The Scoop:
Admittedly, there is not much on the lower western shore of Maryland's
Chesapeake Bay of interest to the railfan. For some reason, the railroads
did not find much to "go after" to spread the rails in these here parts.
The Chesapeake Beach Rwy Museum is the one
exception, but, it is far enough out of the way to NOT be a destination in and of itself.
There is precious little left of the railroad around today, with the depot
in Chesapeake Beach being the most notable.
If you decide to come this way, you can make the trip a little more productive
by stopping in Annapolis, and taking in some of the sights there like the harbor.
Annapolis, as you may know, is the capitol of Maryland. It is home to the Naval Academy.
And is a popular summer destination for seafood lovers and boaters.
The Bay Bridge is a two parallel bridge affair, one having been built in the early 60's, the
other starting in 1969. Maryland is in the process or either replacing
them or augmenting the two existing bridges. The bridge allows easy
access from Baltimore and Washington DC, eliminating a very long circuitous
drive up thru Delaware. The planners should allow room for a light
rail line, but I'm sure that will never happen - in order to go to Ocean City by
train, now that would be cool!!!
The Maryland Renaissance Festival is one
of the larger and longest running Faires of it's kind. It runs from August
thru the end of October.
Although it is not a tourist destination, Northrop
Grumman has their Bay Bridge
facility in Annapolis off of Rt 50, along the shore. They do a lot of Navy
research from here. I worked there back in the ole Westinghouse days!
Acknowledgements:
Martin Falbisoner
Google Maps
Open Railway Map
Wikipedia
From Washington DC: Head east on US50 and take the
MD3/US301 exit going south. About 10 miles south, hang a left onto MD4.
Then, look for the signs for MD260, Chesapeake Beach Rd. About 6 miles
later after passing MD2, you'll make a slight left where Mt Harmony-Parks Rd
joins in. Stay on this till you come to a "T" and hang a right, the museum
will be on your left after about half a mile.
From Baltimore: Head down I-97 and get off at exit 7, which
is MD3/US301, and follow the map as above for DC.
From Annapolis or the eastern shore: Look for the MD2 exit
and head south on it till you get to MD260 and take a left.
On coming out of town, make sure you bear to the right when Mt Harmony-Parks
Rd goes straight and Chesapeake Beach Road goes off to the right.
A Little History -- The
Chesapeake Beach Railway was completed in 1899,
but since the Belvedere Hotel in Chesapeake Beach was not yet completed, service
to Chesapeake Beach did not start till June of the following year. The
line never did well financially, and never paid the interest on the million
dollar mortgage. The BCR took possession of the
Southern Maryland RR's track in DC in 1898. The Southern
Maryland went into bankruptcy, and when reorganized in 1901, emerged as the
Washington, Potomac, and Chesapeake Rwy. In 1902, the new railroad sued
the CBR saying that they still owned the track..... and they won. Highway
construction around the area in 1921, and as a result, traffic on the CBR
started a decline. They were hoping for an increase in traffic with a
ferry going across the Chesapeake Bay, but the effort was blocked by an already
establish ferry operator. In 1935, the railroad decided to replace train
service with a bus, and the last train left Chesapeake Beach on April 15th, 1935.
What's Left:
-- Part of the eastern end of Chesapeake Beach road uses the right-of-way.
-- The base of the Lyons Creek trestle is still visible from the MD260 exit ramp off of MD4.
-- The base of the swing bridge over the Patuxent River at Jug Bay Wetlands Sanctuary as
well as the fill for the railroad bed on the both sides of the river.
-- There are numerous other places where roads follow the ex right-of-way, Wikipedia has more info.
The Maryland Renaissance Festival
is one of the larger and longest running Faires of it's kind. It runs from
August thru the end of October. 2026 was their 50th season. Their
website is here. My biggest
complaint about ALL of the Renfaires, is that they have gone (or are going to) an online ticket
"thing", with limits to the number they sell for each day. What this means
for those of you who don't plan WAY AHEAD, is that if you decide on the
spur of the moment to go, you're screwed - you ain't going. Plus, like
other online ticket venues, I'm sure there are people out there buying chucks of
tickets, and reselling to you at highly inflated prices. I personally
haven't gone in years because of this..... My other favorite Renfaire
to go to was the one above Lancaster PA, but it's the same story there too.
:-( :-( I know, want some cheese to go with that whine? Ha LOL
Shout-out to my wife who dressed up for one of the faires - she's below, but I
ain't sayin which one :-)
The Maryland State House is located in Annapolis, Maryland. It is the oldest U.S. state
capitol in continuous legislative use, dating to 1772, and houses the Maryland General
Assembly, plus the offices of the governor and lieutenant governor. In 1783 and 1784 it
served as the capitol building of the United States Congress of the Confederation, and
is where Ratification Day, the formal end of the American Revolutionary War, occurred.
The capitol has the distinction of being topped by the largest wooden dome in the United
States constructed without nails. The current building, which was designated a National
Historic Landmark in 1960,[2] is the third statehouse on its site.[3] The building is
administered by the State House Trust, established in 1969.
The Chesapeake Bay Bridge, a toll bridge, opened for
business on July 30th, 1952. It opened as a single bridge with two lanes
and cost $45 million to complete. The bridge had been in the works since
the late 20's, but something called the Great Depression got in it's way, as did
WWII. Construction finally got started in the late 40's. The second
span, started in 1969, was completed in 1973, cost $148 million, and had three
lanes. Because of it's length, roughly 4 miles, it is always undergoing
painting.... when they get to the end, they start over at the opposite end.
The bridge has it's own website at:
http://www.baybridge.com/
I don't know why in their wide angle view they blank
out the central suspended spans, because if you zoom in, they show them.
The site for the bridge was picked because it is the narrow-most spot of the
Bay this far south. The suspended spans would be at the dark spot the
arrow is pointing to.
From Wikipedia: In 1891, Baltimore lawyer (and later Maryland governor) Edwin Warfield and others
organized the Washington & Chesapeake Beach Railway to connect Washington, D.C., with 3,000 acres (12 km2)
of virgin bay front property at Fishing Creek where they would build a resort. Their Chesapeake Beach MD
resort was to be a vacation spot for the rich and middle class alike, with two grand hotels, a boardwalk,
racetrack, and amusements. A pier would accommodate Chesapeake Bay excursion steamers from Baltimore,
Annapolis, and Eastern Shore points. In 1894, the W&CBR was granted a charter to incorporate the Town of
Chesapeake Beach. Its grand schemes never bore fruit, and the railway was placed in receivership in 1895.
A new company, the Chesapeake Beach Railway Company, took up the idea in 1896. In 1897, Otto Mears was
placed in control of the company. He started construction in October 1897 at the B&O Railroad's
Alexandria branch north of present-day Deane Avenue between Benning and Kenilworth. On April 7, 1898,
the Chesapeake Beach Railway was given the franchise of the W&CBR. Mears optimistically anticipated
that the railroad would be completed by July 1898—though before it could open, a draw span bridge
would have to be built over the Patuxent River below Bristol to permit steamboat traffic. Plans were
approved by the U.S. Army Corps of Engineers, a contract to construct the bridge was awarded to the
Youngstown Bridge Company, and, after numerous delays, the bridge was open by May 1899. Like much of
the rail infrastructure throughout the United States, the CBR was built and maintained predominantly
by African-American workers. The CBR was segregated by race, with separate waiting rooms and rail
cars for African-Americans.
The CBR entered into successful agreements with the B&O to extend service from their Hyattsville
station on the Washington Branch and then along the Alexandria Branch for four miles to Chesapeake
Junction, located in today's Deanwood neighborhood where current-day Minnesota Avenue NE and Nannie
Helen Burroughs Avenue NE. On December 5, 1898, the line from Hyattsville to Upper Marlboro was
officially opened. Their primary goal was to tap into the Baltimore market by connecting directly
with the Baltimore-Washington trains that stopped at Hyattsville. As part of the contract, B&O
built a separate siding in front of its Hyattsville station for CB trains to lay over. Most of
the time, they ran two round trips a day. By 1899, the line was completed all the way to
Chesapeake Beach; the first excursion train ran on July 31, 1899. The hotel was not ready, so
normal operations on the eastern leg of the railroad began on June 9, 1900.
In April 1900, the Washington Traction & Electric Company extended the old Columbia H Street car
line to Seat Pleasant, connecting with the Chesapeake Beach at the extreme eastern corner of
the District. It became the main way Washington passengers reached the beach trains.
When the Benning Road Power Plant was opened in 1906, a three-block section of the railway became
a critical part of the freight route for coal heading to the plant. Cars were moved on CBR tracks
from the junction with the B&O to a connection with Washington Railway and Electric Company tracks three blocks away.
Operations: In the early years, trains left Hyattsville and used B&O tracks to Chesapeake Junction.
Then it traveled out of the District on the once-abandoned right-of-way of the Southern Maryland
Railroad. It exited D.C. at Seat Pleasant, where it met with the Washington, Baltimore and
Annapolis Electric Railway at a stop called District Line. From there, it went through Upper
Marlboro, passing over the PRR (Pope Creek Branch), and then on to Chesapeake Beach.
On July 7, 1913 their agreement to use B&O tracks ended and afterwards all CB passenger trains
ended their runs at the Seat Pleasant trolley terminal called "District Line." Chesapeake
Junction remained the railroad's primary freight interchange, but the railroad's rural
territory produced little freight. The junction grew steadily more important after the
building of the Benning power plant in 1906.
Coal destined for the Benning power plant was at first moved into the plant by electric
locomotives operating over the tracks of WREC and its successor, Capital Transit. They
transferred from the B&O on about three blocks of the CBR tracks from Chesapeake Junction
to the connection to the streetcar and then along the streetcar line past Kenilworth
Junction to the plant. The plant was the central power facility for the onetime Washington
Railway & Electric Company, the largest of the city's two street railway companies. Later
it was inherited by Potomac Electric Power Company and progressively expanded over the
years as the city's major generating plant. The streetcar company handled all plant
switching and interchange with its own electric locomotives. To avoid the necessity for
the CB to switch the cars over the three block stretch between B & O and the trolley
interchange, CBR made an agreement in 1919 to allow B & O locomotives to use their track,
paying CBR a per-car charge. So the whole operation was carried out on the track of three
companies using B&O and then streetcar locomotives.
In the early years, the fare for the round trip train ride from District Line station to
Chesapeake Beach was 50 cents (approximately equivalent to $15 in 2017). Express trains
took about 60 minutes to make the trip; “locals” took about 90 minutes.
End of the line: The railroad was never financially successful and never paid off any
interest on its original one million dollar mortgage. Starting in 1921, when the railroad
carried a peak of 352,000 passengers, the increased use of automobiles began to cut into
revenue. The destruction of the luxurious Belvedere Hotel by a fire which originally started
at Klein's Bakery two blocks away on March 30, 1923, further limited business. In 1929, under
new management, an attempt to rehabilitate the line was made and operations continued with
the hope that a new ferry across the Chesapeake Bay to a point on Trippe's Bay in Dorchester
County would drive new business. The ferry was blocked by the Claiborne-Annapolis Ferry Company,
a competing ferry out of Annapolis. A hurricane in 1933 irreparably damaged the resort's
facilities, and the subsequent loss of business led to foreclosure and a request for abandonment
in 1935. On April 15, 1935, after entering receivership, the last train left Chesapeake
Beach. All but the 2.631 miles from the roundhouse at "Maryland Park" to the junction at Deanwood,
which confusingly took on the name of "Chesapeake Junction" in later years, and the 0.756 mile
spur from Chesapeake junction to the PEPCO plant was abandoned, as that section had significant
freight business. The remaining section was bought that same year by the East Washington
Railway, formed specifically for that purpose, and the rail east of Maryland Park was
removed in the summer of 1935 and the best of it sold to plantation railroads in Cuba. Most
of the cars were burned and the metal sold for scrap, except for two that were transferred
to the East Washington—the Dolores and San Juan—and a mail car. Two of the three remaining
engines were transferred to the East Washington as well.
For additional info and details, and the rest of the story, click on the Wikipedia link above.
Chesapeake Beach Railway Timeline:
1891 - Baltimore lawyer (and later Maryland governor) Edwin Warfield and others organized the Washington & Chesapeake Beach Railway
1894 - The W&CBR was granted a charter to incorporate the Town of Chesapeake Beach
1895 - Its grand schemes never bore fruit, and the railway was placed in receivership
1896 - A new company, the Chesapeake Beach Railway Company, took up the idea
1897 - Otto Mears was placed in control of the company
10/1897 - Construction started at the B&O Railroad's Alexandria branch north of present-day Deane Avenue between Benning and Kenilworth
4/7/1898 - The Chesapeake Beach Railway was given the franchise of the W&CBR
5/1899 - Draw span bridge over the Patuxent River below Bristol completed
12/5/1898 - The line from Hyattsville to Upper Marlboro was officially opened
--- Their primary goal was to tap into the Baltimore market by connecting directly with the Baltimore-Washington trains that stopped at Hyattsville
--- As part of the contract, B&O built a separate siding in front of its Hyattsville station for CB trains to lay over
1899 - The line was completed all the way to Chesapeake Beach
7/31/1899 - The first excursion train ran
6/9/900 - The hotel was not ready, so normal operations on the eastern leg of the railroad didn't begin until this date
4/1900 - The Washington Traction & Electric Company extended the old Columbia H Street car line to Seat Pleasant
--- Connecting with the CBR at the extreme eastern corner of the District
--- It became the main way Washington passengers reached the beach trains
1906 - The Benning Road Power Plant was opened
--- The plant was the central power facility for the onetime Washington Railway & Electric Company,
the largest of the city's two street railway companies
In the early years:
- Trains left Hyattsville and used B&O tracks to Chesapeake Junction
- Then traveled out of the District on the once-abandoned right-of-way of the Southern Maryland Railroad
- Exited DC at Seat Pleasant, where it met with the Washington, Baltimore and Annapolis Electric Railway at a stop called District Line
- From there, it went through Upper Marlboro, passing over the PRR (Pope Creek Branch), and then on to Chesapeake Beach
- The fare for the round trip train ride from District Line station to Chesapeake Beach was 50 cents (approximately equivalent to $15 in 2017
- Express trains took about 60 minutes to make the trip, “locals” took about 90 minutes
7/7/1913 - Their agreement to use B&O tracks ended, all CBR passenger trains now ended their runs at the Seat Pleasant trolley terminal called "District Line."
--- Chesapeake Junction remained the railroad's primary freight interchange, but the railroad's rural territory produced little freight
--- The junction grew steadily more important after the building of the Benning power plant in 1906
1921 - The railroad carried a peak of 352,000 passengers
3/30/1923 - Destruction of the luxurious Belvedere Hotel by a fire which originally started at Klein's Bakery two blocks away
1929 - Under new management, an attempt to rehabilitate the line was made
--- Operations continued with the hope that a new ferry across the Chesapeake Bay to a point on Trippe's Bay in Dorchester County would drive new business
--- The ferry was blocked by the Claiborne-Annapolis Ferry Company, a competing ferry out of Annapolis
1933 - Hurricane irreparably damaged the resort's facilities, and the subsequent loss of business led to foreclosure
1935 - Applied for abandonment
4/15/1935 - after entering receivership, the last train left Chesapeake Beach
--- All but the 2.631 miles from the roundhouse at "Maryland Park" to the junction at Deanwood,
which confusingly took on the name of "Chesapeake Junction" in later years, and the 0.756 mile
spur from Chesapeake junction to the PEPCO plant was abandoned, as that section had significant freight business
1935 - The remaining section was bought by the East Washington Railway, formed specifically for that purpose
1935 - Rail east of Maryland Park was removed over the summer and the best of it sold to plantation railroads in Cuba
--- Most of the cars were burned and the metal sold for scrap, except for two that were transferred to the East Washington: the Dolores and San Juan; and a mail car
--- Two of the three remaining engines were transferred to the East Washington as well
Southern Maryland Railroad section Timeline:
1884 - The Southern Maryland Railroad (SMR) began constructing a rail line from Deanwood towards the District line
--- It eventually planned to connect to Brandywine and the rest of its rail line
1886 - They laid out the right-of-way and graded the line, laying down ties and rail
1898 - The CBR took possession of this section of railway, presumably via a tax auction and used it for its operation
1901 - The SMR emerged from bankruptcy as the Washington, Potomac & Chesapeake Railway (WP&CR)
1902 - The WP&CR sued the CBR, claiming they still owned the railbed
1905 - The case went to the Supreme Court - the WP&CR won and took title to the railway
--- The CBR stopped running on the DC section of the railway, instead stopping at the train station in Seat Pleasant at the District Line station
--- Passengers would get there by using the Columbia Railway's street car line from Navy Yard.
1911 - They started leasing the District section of the line and continued until the WP&CR went out of business in 1918
--- At that point the CBR purchased that section
East Washington Railway Timeline:
1935 - The 3.4 mile long East Washington Railway (EWR) survived for 40 years after the Chesapeake Beach Railway stopped running in 1935
--- Its main customers were a liquor wholesaler, a cement company, a bakery and PEPCO, the local power company
--- PEPCO needed coal delivered to its Benning Road Plant from Chesapeake Junction, the interchange with the Baltimore and Ohio Railroad
1944 - No. 103, an Alco RS-1, was built for the Washington Terminal Company in Washington DC
7/1944 - No. 102, a Whitcomb 65-ton centercab, was built as U.S. Army #8465
9/1946 - No. 101, a GE 45-ton centercab, was built and purchased by the EWR
4/1968 - The Alco RS-1 was purchased by the EWR
1970 - The GE centercab was retired and sold to the Pinto Islands Metals Company in Mobile AL
--- For decades the GE centercab has been the plant switcher at the James River Cogeneration Company in Hopewell VA
--- The plant retired the centercab in 2019
--- It was acquired by the Richmond Railroad Museum in Richmond VA, it's at the museum's satellite yard in Hallsboro VA
1/1970 - The Alco RS-1 was sold to Union Equity Grain in Pasadena TX
--- Later acquired by an individual owner, it was stored in Texas until it was damaged in a collision and subsequently scrapped in 2013
1975 - The power plant converted to oil to meet District environmental regulations which resulted in the demise of the EWR as PEPCO accounted for 97% of their revenue
8/18/1975 - The last coal train down the PEPCO spur
1978 - The railroad, which by then was down to four employees from 10, and a single Whitcomb ceased operations
after successfully overcoming a protest of their abandonment by the liquor warehouse owner.
1978 - The tracks were sold to the Maryland Midland Railway which pulled them up and sold most of the rail and some of the ties.
The remainder were kept in storage by the Maryland Midland
1978 - Following the demise of the EWR, the Whitcomb centercab was acquired as the first motive power for the new Maryland Midland Railway
--- After a career working as a quarry switcher in Ohio, it was acquired by the Hocking Valley Scenic Rwy, a tourist line in Ohio